Projects
Our Projects
Latest Works
LCI Khewra Project – 18MW Steam Turbine Major Overhauling
We successfully completed the 18MW Steam Turbine Major Overhauling at the LCI Khewra Project, ensuring improved efficiency, reliability, and long-term performance of the power generation system.
Scope of Work
Core Activities:
Sand Blasting of rotor and diaphragm
Steam Turbine Rotor Balancing
Labyrinth Seal Maintenance
Steam Turbine Bolt Tightening
Major Overhauling Activities:
Bolt opening and tightening with Hydraulic Torque Wrench
Reducing Gearbox Preventive Maintenance
Generator & Exciter Major Overhauling
Alignment of Steam Turbine and Generator
This project enhanced operational stability, reduced vibration, and extended the lifespan of critical equipment.









































50MW CFPP – Sitara Energy Project
At the 50MW Coal Fired Power Plant (CFPP) – Sitara Energy Project, we successfully executed the Erection, Installation, and Commissioning of the 50MW Steam Turbine (Shanghai Electric Model 9C50), ensuring seamless integration and optimal performance of the power generation system.
Our scope of work covered complete mechanical erection, precision alignment of turbine-generator components, hydraulic torque tightening, rotor inspection and balancing, and comprehensive pre-commissioning checks. The commissioning process included system testing, performance verification, and operational readiness validation in strict compliance with safety standards and OEM guidelines.
This project demonstrates our strong expertise in large-scale steam turbine installation and commissioning, delivering enhanced operational reliability, minimized downtime, and improved efficiency for thermal power plant operations.
1180MW CCPP POWER PLANT PLANT MAINTENANCE JOB
Engineering Excellence successfully carried out a comprehensive maintenance project at the 1180MW CCPP Power Plant in Bhikki, Sheikhupura for client HEI. The project scope included TBS repair and screen replacement, pit dewatering, ACW pump dismantling and assembling, cooling tower fan shaft alignment, and nozzle cleaning. In addition, the team performed GT filter replacements and complete painting of plant equipment, piping, and buildings, ensuring enhanced operational efficiency and long-term protection of assets. This project showcased our strong technical capabilities, attention to detail, and commitment to maintaining world-class quality.








900MW CCPP BQPS -3 K- ELECTIC PORT QASIM KARACHI
Engineering Excellence Partners successfully executed a comprehensive service project at the 900MW CCPP BQPS-III K-Electric Power Plant in Port Qasim, Karachi. The scope of work included technical manpower supply, equipment spare parts and material supply, equipment and building paint work, and scaffolding installation. Our experienced team ensured timely execution and strict adherence to safety and quality standards throughout the project. This engagement showcased our ability to deliver integrated engineering and maintenance solutions, supporting the client in achieving reliable plant operations and improved efficiency.
38MW CFPP SITARA COAL POWER PLANT
In 2015, Engineering Excellence Partners successfully completed its first major project at the 38MW Sitara Coal-Fired Power Plant. The project scope included the installation, commissioning, and start-up of the HTC Steam Turbine, Flender Gear Box, Jinan Generator, and all Balance of Plant (BOP) equipment. This milestone project not only demonstrated our technical expertise and strong engineering capabilities but also highlighted our commitment to safety, precision, and timely execution. It served as a solid foundation for our reputation as a trusted provider of reliable and efficient solutions for complex power plant operations








LCI LUCKY CORE INDUSTRIAL KHEWRA SODA ASH COMPANY
Engineering Excellence Partners carried out a maintenance and supply project at LCI Lucky Core Industrial, Khewra Soda Ash Company, ensuring smooth and uninterrupted plant operations. The project scope included equipment spare parts and material supply, turbine lube oil cooler tube replacement, and comprehensive plant maintenance
services. Our skilled team executed all tasks with precision, safety, and efficiency, reinforcing our commitment to delivering high-quality engineering solutions and maintaining long-term client satisfaction.
HTC HEAD OFFICE LAHORE TURBINE MANUFACTURER COMPANY CHINA
Engineering Excellence Partners provided technical manpower support services to HTC Head Office Lahore, a leading Chinese turbine manufacturing company. The project included both local technical manpower support and overseas technical manpower support, ensuring the availability of skilled professionals for smooth coordination and execution of ongoing operations. This collaboration reflected our ability to deliver reliable workforce solutions that meet international standards of quality, safety, and performance in the engineering sector.




